骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機械有限公司
上海安亭洛浦路45號 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

亚洲男女一区二区三区| 国产熟妇与子伦hd| 最近中文字幕在线mv视频在线| 69久久夜色精品国产69| 国产精品自在欧美一区| 亚洲精品一区二区三区四区乱码| 亚洲精品精华液一区二区| 国产一区二区三区四区五区vm| 精品国产一区二区三区2021| 极品粉嫩小泬无遮挡20p| 欧美日韩中文国产一区| 亚洲中文字幕精品久久| 久久久久国产综合av天堂| 国产在线精品免费aaa片| 亚洲av无码潮喷在线观看| 精品国产一二三产品价格| 久久久久国精品产熟女久色| 又色又爽又黄18禁美女裸身无遮挡| 色婷婷亚洲一区二区三区| 中文字幕丰满伦子无码| 日韩精品久久久久久久电影蜜臀| 国产精品99久久免费黑人人妻| 国产精品无码不卡一区二区三区| r级无码视频在线观看| 久久丫精品国产| 国产日产人妻精品精品| 无码夜色一区二区三区| 午夜欧美精品久久久久久久| 亚洲国产精品成人久久| 国产午夜av秒播在线观看| 天天躁日日躁狠狠久久| 亚洲国产精品尤物yw在线观看| 免费a级毛片无码无遮挡| 欧美人与禽交zozo| 国产重口老太和小伙| 无码精品人妻一区二区三区影院| 亚洲色大成网站www永久网站| 国产亚洲精品久久久久久大师| 中文字幕熟妇人妻在线视频| 成人午夜亚洲精品无码网站| 日韩欧美高清dvd碟片|