骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

国产精品无码一区二区在线| 国产熟妇勾子乱视频| 天堂av无码av日韩av| 精品乱人伦一区二区三区| 国产精品视频一区二区三区四| 双乳被老汉揉搓a毛片免费观看| 欧美xxxx做受性欧美88| 无码精品国产一区二区三区免费| 国产青榴视频在线观看| 国产欧美日韩精品丝袜高跟鞋| 亚洲成av人在线视| 久久av无码精品人妻系列| 国产精品美女www爽爽爽视频| 国产特级毛片aaaaaa| 国产99久久久国产精品免费看| av无码中文字幕不卡一区二区三区| 日韩一区二区在线观看视频| 欧美精品偷自拍另类在线观看| 69久久精品无码一区二区| 少妇私密会所按摩到高潮呻吟| 亚洲国产精品成人精品无码区在线| 亚洲18色成人网站www| 天天躁日日躁狠狠很躁| 国产成人精品a视频一区| 国产午夜精品一区二区三区软件| 成人欧美一区二区三区黑人| 曰韩亚洲av人人夜夜澡人人爽| 国产69精品久久久久app下载| 亚洲av无码乱码国产麻豆| 国产97在线 | 亚洲| 久久精品国产亚洲avapp下载| 中国内地毛片免费高清| 熟妇人妻va精品中文字幕| 中文在线а√天堂| 国产第一页屁屁影院| 国产精品videossex久久发布| 无码少妇精品一区二区免费| 青娱乐极品视觉盛宴国产视频| 五十路丰满中年熟女中出| 精品无码国产污污污免费网站| 天天鲁一鲁摸一摸爽一爽|