骚片av蜜桃精品一区_中文字幕无码毛片免费看_丝袜 亚洲 另类 欧美 变态_亚洲一区二区三区四区五区黄_亚洲中文字幕无码av

上海金泰工程機(jī)械有限公司
45 Luopu Road, Anting, Shanghai 400-820-8326

NEWS

BZ70 Hydraulic walking pile frame

2010-03-20

BZ70 Hydraulic walking pile frame is our heavy equipment which is integrated by mechanical, electrical and hydraulic systems. It is specially made for SMW(Soil Mixing Wall) construction. As a 70 tons grade pile frame, this type machine integrated by new hydraulic system is developed from our JB series Hydraulic walking pile frame technology and construction experience through improved quality and performance. This equipment not only can be hung with SMW multi-shafts drilling machines, but also can be used in other foundation construction projects. So this high performance model machine is a multi-functional equipment to work in foundation projects, such as bridges, harbors and diaphragm walls.


 

1.Stable machine system
Mast, main platform and walking framework are specially designed for heavy pile foundation.
39m mast can meet the construction requirements of ZKD100-3 and ZKD85-3. The bore hole depth could be 32m.
It is adopting big capacity reel drum, the main drum can hold the rope capacity of 550m, and the Max. pulling force is 91.5KN. The auxiliary drum rope capacity is 265m.
The main and auxiliary winches adopt hydraulic proportional control system to achieve continuously variable transmission and lock random speed.
The pace of transverse walking track cylinder is 3100mm, which is well-considered of the SMW construction requirements.
Lifting-up cylinder stroke is 900mm, having the good trafficability.
The stroke of mast horizontal inching cylinder is 400mm and improved the flexibility of construction.
All cylinders adopt hydraulic proportional control system to make them balanced.
2.Comfortable cabin
All-transparent cab, bright, quiet and operator can avoid tiredness.
Easy hydraulic operation, the operation handle of cylinder is ahead of operator.
3.Easy operating system
The operation case is preserved in the cab as well as inductance loading angle monitor (optional) and deep mixing pile monitor (optional).
4.Advanced imported components
The main pump, control valve, pressure meter and winch adopt international brands, such as American, Italy and Germany etc.

5.convenient installation and transportation
The whole machine adopts building-block type and meets the requirements of transportation width and height, easy dismantlement and installment.
The extent girder is driven by hydraulic cylinder and adopts pin swing mechanism to avoid the dismantlement trouble.
39m mast can be self-driven without cranes.

6.sensitive safety operation management device
The inductance loading angle monitor is optional in base of goniometer. This monitor can offer the report to operator about the mast inclination and tensile load situation. It also can give an alarm when in danger.
Deep mixing pile monitor (optional) can feedback pile depth, drilling speed, total slurry  
and slurry for each passage. All these information can be printed according to pile numbers.

24小时日本在线www免费的| 精品无人码麻豆乱码1区2区| 亚洲欧美国产双大乳头| 五十路熟女一区二区三区| 欧美亚洲精品一区二区| 久久精品夜色噜噜亚洲a∨| 色婷婷综合中文久久一本| 亚洲国产av无码专区亚洲av| 香蕉午夜福利院| 内射一区二区精品视频在线观看| 国产青榴视频在线观看| 久久亚洲一区二区三区四区| 色一情一乱一伦一区二区三区| 亚洲av中文无码乱人伦在线视色| 少妇高潮一区二区三区99| 国产精品污www在线观看| 中国少妇内射xxxhd| 人妻在卧室被老板疯狂进入| 粗一硬一长一进一爽一a级| 亚洲综合天堂av网站在线观看| 久久久久久久久无码精品亚洲日韩| 免费无遮挡无码永久在线观看视频| 成人无码精品1区2区3区免费看| 国产97在线 | 亚洲| 曰本极品少妇videossexhd| 久久99精品久久久久婷婷| 国产成人综合在线视频| 99视频30精品视频在线观看| 日韩精品无码一本二本三本| 久久久久久人妻无码| 精品一区二区三区无码免费直播| 欧美大屁股熟妇bbbbbb| 蜜桃av无码免费看永久| 97久久综合区小说区图片区| 丰满少妇大力进入| 成人性做爰aaa片免费看| 精品人妻码一区二区三区| 无码孕妇孕交在线观看| 成熟妇人a片免费看网站| 国产午夜人做人免费视频| 小12萝裸体自慰出白浆|